Plywood above this line to hold out the bottom of the first row of siding and nail the starter strip to this plywood.
Garage slab siding starter course 6 clearance.
Drill minimum 3 16 4 8mm diameter weep holes in the bottom of the j channel no more than 24 610mm.
Ever wonder if siding is too close to the ground.
Determine the lowest point of the wall that will be sided.
Use j channel to receive vertical siding.
As shown in the diagram a wooden spacer can be used to provide the proper angle for the first strip.
Siding materials need proper clearances between finish grade and the siding regardless the type of siding.
In order for the siding to be installed properly in a level fashion the starter strip at the bottom of the wall must be level.
This article will examine just that question of the recommended distance from ground and siding your clearance is vitally important for the siding s long term protection and safeguard.
When building your new home have you ever wondered how close your siding needs to be from the ground.
From that point measure up 1 4 6 4mm less than the width of the starter strip and partially drive a nail at one corner.
If horizontal siding is used a j channel or starter strip must be used.
Cut vinyl pieces to fit with a saw or snips.
Most manufacturers produce a starter strip that secures the bottom course of siding to the sheathing and holds it at the proper angle.
Leave on extra 1 4 inch 0 6 cm of clearance on either side of these marks.
For wood and cement fiber siding generally use 1 by 4 boards overlapped at the corners.
This requirement is not just to prevent damage to the siding it serves a couple of other functions as well.
Then nail a 3 1 2 in.
For vinyl use special trim strips which should come with the.
Having your siding too close to the ground is just asking.
Start with a level chalk line for the bottom starter strip and check the level periodically as you go up.
6 equipment 7 material estimating 8 nomenclature getting started 9 preparation 10 furring and installation techniques 12 base chalk line 13 inside corner 14 outside corner trim 15 starter strip 16 window and door trim 17 window and door trim gable end trim installation 18 cutting procedures 19 installing the siding first course lapping.
Measure the height of the piece you need to cut by butting a scrap piece of siding beneath and above the window and marking the necessary height leaving an additional 1 4 inch 0 6 cm of clearance.
This should be nailed every 6 inches with it s lower edge running along the chalk line.
Step 6 finish your garage siding with trim.
If starter strip is used it is necessary to provide at least 3 8 9 5mm clearance for proper engagement of the siding.